Question | A decision maker wishes to maximize total benefit, B = 3x + xy + y, subject to the cost constraint, C = 4x + 2y = 70. Set up the Lagrangian and then determine the values of x and y at the maximum level of benefit, given the constraint. What are the maximum benefits? |
---|---|
Subject | business-economics |